Conoco-Phillips World Headquarters
Complete roof system replacement
16 fully occupied and operational buildings
370,000 square feet of roof area
11,000 feet of stainless steel edge system
New perimeter safety system
Day and night work shifts for 17 months
27 month total project duration
Largest project to date
UT Health Science Center - Houston
Three building roof replacement package
Fully occupied and operational buildings
Most complex medical school building in Texas
Largest green roof installation in Houston
23 month project duration
Over 20 different roof areas or elevations
Second largest project to date
First large application of catalyzed resin flashing
US Ambassador's Residence - Dublin, Ireland
Oldest US foreign consular building (circa 1776)
Complete roof system replacement
Significant drainage and slope modifications
Salvage and reinstallation of some original slate
Complete replacement of all low-slope areas
Tin coated copper to replace original lead batten seam roofs
Largest and longest duration project outside the US
All work by our US employees with US materials
PROJECT PHOTOS
Competition Roofing, Inc.
7310 Fairview Houston,Texas 77041 ● Ph: 713-937-7710 ● Email: info@competitionroofing.com
Click image to view larger
Click image to view larger
Click image to view larger
MD Anderson Hospital
Most unique building exterior work
access
solution – custom fabricated self-
installed
exterior platform for 10th floor
access
BAE Lansdale, PA
M
ost distant
project for local customer
Customer (BAE Systems) with the most
number of out of town roofing projects
Chase Tower
(in progress)
Tallest Roof
- 75 stories
Most complex roof structural project
-
over 200 antenna supports and new
window washing rail supports
Memorial City Mall
Largest number of roof areas on a single
facility
Largest number of different roof types on
a single facility
CMR Hanoi
M
ost distant foreign project
Customer (US State Department) with the
most number of out of country projects
Glauser Properties
Longest on-going customer relationship
(1988)
Longest roof service life to warranty ratio
– 12
year roof system still performing after
24 years